Mologne Cadet Health Clinic
Client: U.S. Army Corps of EngineersLocation: West Point, NYProject Date: 2008Cost: $7,200,000
Scheduling, Phasing and Construction Phase Services
Cost Estimating
Submittal review
The Mologne Cadet Health Clinic at USMA at West Point, NY was in need of interior and exterior repairs and updates, but required continual operation throughout these activities. NKB provided complete architectural and engineering services for the preparation of construction contract plans, specifications, cost estimate and construction administration services to implement these requirements. This included revising the 100% construction documents originally designed by another firm, updating the Life Safety Code study, construction documents, project phasing plan and cost estimate and working closely with the Corps to meet with individual department user groups and developed a phasing/sequence plan that would allow the facility to remain in operation during construction. Development of temporary modular offices and identification of swing space was also performed.